What is included
- Strip-out to the slab and screed
- Two-coat waterproofing with a 48-hour flood test before tiling
- New drainage and water supply in PPR, pressure-tested
- Wall-hung sanitaryware on concealed frames
- Large-format porcelain or natural stone with minimal joints
- Walk-in showers with linear drains, thermostatic mixers
- Backlit mirrors, ventilation and moisture-rated lighting
- Underfloor heating where requested
Typical duration
2–3 weeks per bathroom; several bathrooms run in parallel.
How we work
- Free site visit with an engineer and a designer
- Itemised BOQ — the price is fixed once signed
- Design package and material board before procurement
- Permits and NOC handled by our engineering office
- Weekly photo and video reports; site access any time
- Snagging, commissioning and a 24-month workmanship warranty
Questions
Why do Dubai bathrooms leak so often?
Original waterproofing in many 2000s villas was single-coat and never tested. We re-do it fully and flood-test before a single tile goes down.
Can you change a bathtub to a walk-in shower?
Yes — it is the most common request. Drain position and screed depth decide the detail.
How long is the warranty?
24 months on workmanship, including waterproofing.