What is included
- Full rewiring and new distribution boards to DEWA requirements
- DEWA load increase applications
- Ducted AC replacement, duct cleaning, VRF where appropriate
- Re-piping in PPR, pressure-tested; new water heaters
- Drainage replacement and sewer camera inspection
- Water treatment and filtration
- Structured cabling, Wi-Fi, CCTV and smart-home control
- Pool and landscape electrical
Typical duration
3–6 weeks as a standalone project; integrated into the schedule of a full renovation.
How we work
- Free site visit with an engineer and a designer
- Itemised BOQ — the price is fixed once signed
- Design package and material board before procurement
- Permits and NOC handled by our engineering office
- Weekly photo and video reports; site access any time
- Snagging, commissioning and a 24-month workmanship warranty
Questions
Do older villas need a DEWA load increase?
Often — modern AC, kitchens and EV chargers exceed 2000s allocations. We prepare the application.
Can you replace AC without ripping out ceilings?
Partly; new ducts usually need ceiling access, which we plan zone by zone.
Which smart-home systems do you install?
Open, wired backbones first — so any control system can be added later without rewiring.