Skip to content

Service · Dubai villas

Villa kitchen renovation in Dubai

Closed kitchens opened to the living area, new wet-point routing, extraction, stone worktops and cabinetry made in our own joinery workshop.

What is included

  • Layout change and wall removal with structural check
  • Re-routing of water, drainage and gas where applicable
  • Dedicated electrical circuits for appliances, DEWA-compliant
  • Ducted extraction to the exterior
  • Cabinetry built to measure in our workshop, soft-close hardware
  • Quartz, porcelain or natural stone worktops and splashbacks
  • Under-cabinet and pendant lighting scenes
  • Integrated appliances supply and installation

Typical duration

4–8 weeks, longer if the kitchen moves to a new location.

How we work

  1. Free site visit with an engineer and a designer
  2. Itemised BOQ — the price is fixed once signed
  3. Design package and material board before procurement
  4. Permits and NOC handled by our engineering office
  5. Weekly photo and video reports; site access any time
  6. Snagging, commissioning and a 24-month workmanship warranty

Questions

Can we move the kitchen to another room?

Usually yes; drainage falls and extraction routes decide it. We confirm feasibility at the site visit.

Do you make the cabinets yourselves?

Yes — in our own joinery workshop in Dubai, to the millimetre of your room.

Do we need a permit for a kitchen?

If walls, drainage risers or the facade change — yes. A like-for-like replacement usually needs only the community NOC.

Free estimate

Tell us about your villa

Send the community, the villa size and the scope on WhatsApp — or use the calculator to build the request. We come back with a free site visit and an itemised, fixed-price quote.