Full villa renovation
Complete refurbishment of an existing villa: strip-out, structural corrections, new MEP, finishes, joinery, furniture and handover with a snag-free certificate.
- Design
- Permits
- Build
- Furnish
Villa renovation · Dubai · UAE
One contractor for the entire project — design, permit paperwork, demolition, MEP, finishing, joinery and furniture. Fixed price in the contract, weekly reporting, 24-month workmanship warranty.
Since 2019 · Licensed Dubai contractor · Works across the UAE
Free site visit anywhere in Dubai · Written estimate within 3–5 days
What we do
From a single bathroom to a complete rebuild of a 1,000 m² villa. Every scope below is delivered by the same team under one contract, one schedule and one point of responsibility.

Complete refurbishment of an existing villa: strip-out, structural corrections, new MEP, finishes, joinery, furniture and handover with a snag-free certificate.

Closed kitchens opened up to the living area, new wet-point routing, extraction, stone worktops and cabinetry made in our own joinery workshop.

Full re-waterproofing to Dubai Municipality standard, re-routed drainage, book-matched stone, concealed cisterns and hotel-grade shower systems.

Guest majlis, formal living and dining rooms — gypsum panelling, decorative ceilings, lighting scenes and bespoke seating to your own dimensions.

Room extensions, an additional floor, closed balconies, new cladding and windows — with structural drawings and full authority approval.

New pools and pool refurbishment, plant rooms, decking, pergolas, outdoor kitchens, irrigation and landscape lighting — all under the same contract.

The part of a renovation that decides whether the finish still looks new in five years: full rewiring and DEWA-compliant distribution, ducted AC replacement and duct cleaning, re-piping in PPR, smart-home and CCTV backbone, water treatment, and bespoke joinery produced in our own workshop rather than bought in.
Why owners choose us
We started in 2019 doing exactly what we do today — renovating private villas in Dubai. Everything below exists because a project once went wrong without it.
The contract is priced against a detailed BOQ and approved drawings. No open-ended "provisional sums". Any variation is quoted and approved in writing before a single worker touches it.
Foremen, electricians, plumbers, tilers and carpenters are on our payroll. Specialist trades are the exception, not the model — so quality and schedule stay under our control.
Dubai Municipality, Trakhees, DDA, developer and community NOCs, DEWA applications — our engineering office prepares the complete package and walks you through each submission, so your part comes down to a signature and a short visit or an online form.
Weekly photo and video reports, a live progress schedule, video walkthroughs on request, and procurement decisions confirmed over WhatsApp. You fly in for handover, not for site meetings.
Waterproofing flood tests, pressure tests on pipework, insulation and load checks, and photographic records of everything that will end up behind a wall — handed to you as a project file.
Two years of workmanship warranty on everything we build; materials and equipment remain under their manufacturers' warranties. Callouts are handled by our own maintenance crew, usually within 48 hours.
How it works
Typical timeline for a full renovation of a 500–700 m² villa. Partial scopes move faster; design and approvals overlap wherever the community allows it.
STEP 01
An engineer and a designer visit the villa, survey the existing structure and MEP, and go through what you want to change. You get an honest view of what the building will and will not allow.
Free · 1 daySTEP 02
A line-by-line BOQ with quantities, materials and unit rates — not a single lump sum. Once signed, that price is fixed and the payment schedule is tied to completed stages.
3–5 daysSTEP 03
Layouts, 3D visualisations, MEP and joinery drawings, and a physical material board — stone, tiles, paint, ironmongery — signed off before procurement starts.
3–6 weeksSTEP 04
Permit package prepared for the relevant authority and the developer NOC; you submit it as the owner with our guidance. Deposits, site access and site protection, waste management and working-hour compliance set up before demolition.
2–4 weeksSTEP 05
Demolition, structure, MEP first fix, waterproofing and flood tests, finishes, second fix, joinery and furniture. Weekly reports, and site access for you at any time.
4–6 monthsSTEP 06
Joint inspection, a written snag list closed before signature, commissioning of all systems, as-built drawings, equipment documents and manuals handed over as one project file.
1–2 weeksSelected work
A cross-section of recent projects across Dubai communities — from a single-floor refresh to full structural rebuilds.
Drag to see the transformation
Living room of a villa in Emirates Hills: stripped to the concrete shell, then rebuilt — new MEP, travertine floor, bespoke joinery and lighting. Move the handle.
Before
After






Cost calculator
Set the villa size, pick the scope and add-ons. Send the request on WhatsApp — we prepare an exact, itemised quote after a free site visit.
Second opinion
Send it to us on WhatsApp. Within one working day we check it for free: missing works, vague "provisional sums", unrealistic timelines and hidden extras. No obligation — you simply sign a better contract.
Permits & compliance
Unpermitted work is the most expensive mistake a villa owner can make: stop-work notices, fines, refused DEWA connection and, at resale, a property that does not match its registered drawings. We prepare the full package and guide you through every submission.
Coverage
We renovate across Dubai and travel to Abu Dhabi and Sharjah for larger projects. These are the communities we work in most often, each with its own approval route and community rules we already know.
Clients
★★★★★
We were in London for almost the entire build. The weekly reports were detailed enough that we never felt out of control, and the final figure matched the contract to the dirham.
★★★★★
Two previous contractors told us the extension was impossible. This team came back with structural drawings and the municipality permit in five weeks, and built it.
★★★★★
What convinced me was the estimate — a real BOQ with quantities instead of one number on a page. Two years on, the only warranty call was a pool light.
Questions
Every villa is priced individually — the figure depends on the building's condition, the scope and the finish level, so we do not publish per-m² rates. Send the size and scope through the calculator or on WhatsApp: after a free site visit you receive an itemised BOQ quote, and that price is fixed in the contract.
A partial renovation of a 4-bedroom villa takes about 8 to 12 weeks. A full renovation of a 500–700 m² villa usually takes 4 to 6 months on site, plus 3 to 6 weeks for design and 2 to 4 weeks for approvals, which run in parallel where the community allows it.
Yes. Most works require a permit from Dubai Municipality or the relevant authority — Trakhees in Nakheel communities, DDA inside Dubai Development Authority areas — together with an NOC from the developer or community management. Structural changes, extensions, pools and any modification of MEP risers always require approval. We prepare the complete package and accompany you through submission — applications are filed in the owner's name.
No. The contract price is fixed against a signed BOQ and drawings. It changes only if you request additional scope, and each variation is priced and approved in writing before the work starts.
Yes. A large share of our clients are outside the UAE. You receive a weekly photo and video report, a live progress schedule, and video walkthroughs on request. Procurement and snagging are handled by our team; for approvals we prepare everything so that your involvement is limited to signatures, and you only need to be present for the final handover.
Yes — 24 months of workmanship warranty on the works we execute. Materials and equipment such as air conditioning, pool plant and appliances are covered by their manufacturers' warranties, not by us. Callouts on our works are handled by our own maintenance team.
Yes. We execute third-party designs as a main contractor, and we also produce the full design package in-house when there is no designer on the project. In both cases we take single-point responsibility for the site.
For a full renovation we recommend vacating the villa, mainly because of demolition dust, MEP shutdowns and community working-hour rules. Partial works — one floor, a kitchen or bathrooms — can be phased and zoned so the rest of the house stays usable.
Free estimate
Send the community, the approximate area and what you want to change. On WhatsApp we usually reply within the hour during working hours; the site visit and the written quote cost you nothing.