Skip to content
Villa RenovationDubai · Since 2019
Villa renovation in Dubai — luxury villa at dusk after a full renovation, lit interiors and infinity pool

Villa renovation · Dubai · UAE

Villa renovation in Dubai, from design to handover since 2019

One contractor for the entire project — design, permit paperwork, demolition, MEP, finishing, joinery and furniture. Fixed price in the contract, weekly reporting, 24-month workmanship warranty.

Since 2019 · Licensed Dubai contractor · Works across the UAE

Free site visit anywhere in Dubai · Written estimate within 3–5 days

2019Working in Dubai since
180+Villas & homes delivered
24 moWorkmanship warranty
FixedPrice in the contract

What we do

Villa renovation services in Dubai

From a single bathroom to a complete rebuild of a 1,000 m² villa. Every scope below is delivered by the same team under one contract, one schedule and one point of responsibility.

Full villa renovation in Dubai — double-height living room after a complete renovation

Full villa renovation

Complete refurbishment of an existing villa: strip-out, structural corrections, new MEP, finishes, joinery, furniture and handover with a snag-free certificate.

  • Design
  • Permits
  • Build
  • Furnish
Learn more →
Villa kitchen renovation in Dubai — open-plan kitchen with marble island

Kitchen renovation

Closed kitchens opened up to the living area, new wet-point routing, extraction, stone worktops and cabinetry made in our own joinery workshop.

  • Layout change
  • Stone
  • Cabinetry
Learn more →
Villa bathroom renovation in Dubai — master bathroom in beige marble

Bathrooms & wet areas

Full re-waterproofing to Dubai Municipality standard, re-routed drainage, book-matched stone, concealed cisterns and hotel-grade shower systems.

  • Waterproofing
  • Marble
  • Sanitary
Learn more →
Majlis design and renovation in a Dubai villa — modern Arabic majlis with champagne seating and brass chandelier

Majlis & reception areas

Guest majlis, formal living and dining rooms — gypsum panelling, decorative ceilings, lighting scenes and bespoke seating to your own dimensions.

  • Panelling
  • Lighting
  • Furniture
Learn more →
Villa extension and facade renovation in Dubai — new travertine cladding

Extensions & facade

Room extensions, an additional floor, closed balconies, new cladding and windows — with structural drawings and full authority approval.

  • Structure
  • Cladding
  • Windows
Learn more →
Pool construction and landscaping for a Dubai villa — illuminated pool and garden at night

Pools & landscaping

New pools and pool refurbishment, plant rooms, decking, pergolas, outdoor kitchens, irrigation and landscape lighting — all under the same contract.

  • Pool
  • Hardscape
  • Planting
Learn more →
Villa renovation contractor in Dubai — clean organised site with protected floors and new partitions

MEP, joinery and everything behind the walls

The part of a renovation that decides whether the finish still looks new in five years: full rewiring and DEWA-compliant distribution, ducted AC replacement and duct cleaning, re-piping in PPR, smart-home and CCTV backbone, water treatment, and bespoke joinery produced in our own workshop rather than bought in.

  • Electrical & DEWA
  • HVAC
  • Plumbing
  • Smart home
  • Wardrobes
  • Doors
  • Wall panelling
Learn more →

Why owners choose us

Renovating Dubai villas since 2019 — and the habits that came with it

We started in 2019 doing exactly what we do today — renovating private villas in Dubai. Everything below exists because a project once went wrong without it.

  • 01 — Money

    The price you sign is the price you pay

    The contract is priced against a detailed BOQ and approved drawings. No open-ended "provisional sums". Any variation is quoted and approved in writing before a single worker touches it.

  • 02 — People

    Our own crews on your site

    Foremen, electricians, plumbers, tilers and carpenters are on our payroll. Specialist trades are the exception, not the model — so quality and schedule stay under our control.

  • 03 — Paperwork

    Paperwork with minimal effort from you

    Dubai Municipality, Trakhees, DDA, developer and community NOCs, DEWA applications — our engineering office prepares the complete package and walks you through each submission, so your part comes down to a signature and a short visit or an online form.

  • 04 — Distance

    Built for owners living abroad

    Weekly photo and video reports, a live progress schedule, video walkthroughs on request, and procurement decisions confirmed over WhatsApp. You fly in for handover, not for site meetings.

  • 05 — Quality

    Hidden works checked before they disappear

    Waterproofing flood tests, pressure tests on pipework, insulation and load checks, and photographic records of everything that will end up behind a wall — handed to you as a project file.

  • 06 — After

    24 months of warranty, and a team that answers

    Two years of workmanship warranty on everything we build; materials and equipment remain under their manufacturers' warranties. Callouts are handled by our own maintenance crew, usually within 48 hours.

How it works

From first call to keys — six clear stages

Typical timeline for a full renovation of a 500–700 m² villa. Partial scopes move faster; design and approvals overlap wherever the community allows it.

STEP 01

Site visit & brief

An engineer and a designer visit the villa, survey the existing structure and MEP, and go through what you want to change. You get an honest view of what the building will and will not allow.

Free · 1 day

STEP 02

Estimate & contract

A line-by-line BOQ with quantities, materials and unit rates — not a single lump sum. Once signed, that price is fixed and the payment schedule is tied to completed stages.

3–5 days

STEP 03

Design & material selection

Layouts, 3D visualisations, MEP and joinery drawings, and a physical material board — stone, tiles, paint, ironmongery — signed off before procurement starts.

3–6 weeks

STEP 04

Approvals & mobilisation

Permit package prepared for the relevant authority and the developer NOC; you submit it as the owner with our guidance. Deposits, site access and site protection, waste management and working-hour compliance set up before demolition.

2–4 weeks

STEP 05

Construction & fit-out

Demolition, structure, MEP first fix, waterproofing and flood tests, finishes, second fix, joinery and furniture. Weekly reports, and site access for you at any time.

4–6 months

STEP 06

Snagging & handover

Joint inspection, a written snag list closed before signature, commissioning of all systems, as-built drawings, equipment documents and manuals handed over as one project file.

1–2 weeks

Selected work

Villas we have renovated in Dubai

A cross-section of recent projects across Dubai communities — from a single-floor refresh to full structural rebuilds.

Drag to see the transformation

Same room. Before and after.

Living room of a villa in Emirates Hills: stripped to the concrete shell, then rebuilt — new MEP, travertine floor, bespoke joinery and lighting. Move the handle.

Villa renovation in Dubai, after: the same living room after full renovation Villa renovation in Dubai, before: living room stripped to the concrete shell Before After
Villa renovation in Emirates Hills, Dubai — renovated double-height living room
Living & dining, Emirates HillsFull renovation · 740 m²
Villa renovation in Al Barari, Dubai — renovated majlis
Majlis, Al BarariFit-out · 120 m²
Villa renovation on Palm Jumeirah, Dubai — renovated kitchen
Kitchen, Palm JumeirahLayout change · 62 m²
Villa renovation in Dubai Hills Estate — renovated master bathroom
Master bathroom, Dubai HillsRe-waterproofed · 28 m²
Villa renovation in Arabian Ranches, Dubai — facade after exterior renovation
Facade, Arabian RanchesRecladding · 310 m²
Villa renovation in Jumeirah Islands, Dubai — pool and garden after landscaping works
Pool & garden, Jumeirah IslandsPool rebuild & landscape

Cost calculator

Calculate your renovation quote

Set the villa size, pick the scope and add-ons. Send the request on WhatsApp — we prepare an exact, itemised quote after a free site visit.

m²
Scope of work
Additional works
Community
When do you plan to start?

Your request

Villa built-up area
—
Scope of work
—
Additional works
—
Community
—
When do you plan to start?
—

No instant figures — every villa is different. We reply on WhatsApp within the hour during working hours with a free site visit and an itemised quote.

or write on WhatsApp directly →

Second opinion

Already have a quote from another contractor?

Send it to us on WhatsApp. Within one working day we check it for free: missing works, vague "provisional sums", unrealistic timelines and hidden extras. No obligation — you simply sign a better contract.

Send a quote for a free check
Bespoke joinery in a renovated Dubai villa — curved staircase with bronze balustrade

Permits & compliance

Renovating legally in Dubai

Unpermitted work is the most expensive mistake a villa owner can make: stop-work notices, fines, refused DEWA connection and, at resale, a property that does not match its registered drawings. We prepare the full package and guide you through every submission.

  • Dubai Municipality building modification permit and completion certificate
  • Trakhees approval for Nakheel communities — Palm Jumeirah, Jumeirah Islands, Jumeirah Park
  • DDA approval inside Dubai Development Authority areas
  • Developer and community NOC — Emaar, Nakheel, Meraas, Dubai Properties
  • DEWA applications for load increase, disconnection and reconnection
  • Structural drawings stamped by a licensed consultant for any load-bearing change
  • Site insurance, security deposits, working-hour and waste-disposal compliance

Coverage

Villa communities we work in

We renovate across Dubai and travel to Abu Dhabi and Sharjah for larger projects. These are the communities we work in most often, each with its own approval route and community rules we already know.

All 20 communities with approval routes →

Clients

What villa owners say

★★★★★

We were in London for almost the entire build. The weekly reports were detailed enough that we never felt out of control, and the final figure matched the contract to the dirham.

Sarah M.Full renovation, Dubai Hills Estate

★★★★★

Two previous contractors told us the extension was impossible. This team came back with structural drawings and the municipality permit in five weeks, and built it.

Ahmed R.Extension & majlis, Al Barari

★★★★★

What convinced me was the estimate — a real BOQ with quantities instead of one number on a page. Two years on, the only warranty call was a pool light.

Dmitry K.Full villa renovation, Jumeirah Islands

Questions

Villa renovation in Dubai — frequently asked

How much does it cost to renovate a villa in Dubai?

Every villa is priced individually — the figure depends on the building's condition, the scope and the finish level, so we do not publish per-m² rates. Send the size and scope through the calculator or on WhatsApp: after a free site visit you receive an itemised BOQ quote, and that price is fixed in the contract.

How long does a villa renovation in Dubai take?

A partial renovation of a 4-bedroom villa takes about 8 to 12 weeks. A full renovation of a 500–700 m² villa usually takes 4 to 6 months on site, plus 3 to 6 weeks for design and 2 to 4 weeks for approvals, which run in parallel where the community allows it.

Do I need approvals to renovate a villa in Dubai?

Yes. Most works require a permit from Dubai Municipality or the relevant authority — Trakhees in Nakheel communities, DDA inside Dubai Development Authority areas — together with an NOC from the developer or community management. Structural changes, extensions, pools and any modification of MEP risers always require approval. We prepare the complete package and accompany you through submission — applications are filed in the owner's name.

Can the price change after the contract is signed?

No. The contract price is fixed against a signed BOQ and drawings. It changes only if you request additional scope, and each variation is priced and approved in writing before the work starts.

Can you manage the project if I live abroad?

Yes. A large share of our clients are outside the UAE. You receive a weekly photo and video report, a live progress schedule, and video walkthroughs on request. Procurement and snagging are handled by our team; for approvals we prepare everything so that your involvement is limited to signatures, and you only need to be present for the final handover.

Do you provide a warranty on the works?

Yes — 24 months of workmanship warranty on the works we execute. Materials and equipment such as air conditioning, pool plant and appliances are covered by their manufacturers' warranties, not by us. Callouts on our works are handled by our own maintenance team.

Do you work with the client's own designer?

Yes. We execute third-party designs as a main contractor, and we also produce the full design package in-house when there is no designer on the project. In both cases we take single-point responsibility for the site.

Can we live in the villa during the renovation?

For a full renovation we recommend vacating the villa, mainly because of demolition dust, MEP shutdowns and community working-hour rules. Partial works — one floor, a kitchen or bathrooms — can be phased and zoned so the rest of the house stays usable.

Free estimate

Tell us about your villa

Send the community, the approximate area and what you want to change. On WhatsApp we usually reply within the hour during working hours; the site visit and the written quote cost you nothing.