Skip to content
Luxury villa in Dubai at dusk after a full turnkey renovation, lit interiors and infinity pool

Turnkey villa renovation · Dubai · UAE

Villa renovation in Dubai, delivered turnkey since 2019

One contractor for the entire project — design, municipality approvals, demolition, MEP, finishing, joinery and furniture. Fixed price in the contract, weekly reporting, 24-month workmanship warranty.

Since 2019 · Licensed Dubai contractor · Works across the UAE

Free site visit anywhere in Dubai · Written estimate within 3–5 days

2019Working in Dubai since
180+Villas & homes delivered
24 moWorkmanship warranty
FixedPrice in the contract

What we do

Villa renovation services in Dubai

From a single bathroom to a complete rebuild of a 1,000 m² villa. Every scope below is delivered by the same team under one contract, one schedule and one point of responsibility.

Double-height living room of a Dubai villa after full turnkey renovation

Full turnkey villa renovation

Complete refurbishment of an existing villa: strip-out, structural corrections, new MEP, finishes, joinery, furniture and handover with a snag-free certificate.

  • Design
  • Permits
  • Build
  • Furnish
Renovated open-plan kitchen with marble island in a Dubai villa

Kitchen renovation

Closed kitchens opened up to the living area, new wet-point routing, extraction, stone worktops and cabinetry made in our own joinery workshop.

  • Layout change
  • Stone
  • Cabinetry
Master bathroom in beige marble after renovation in a Dubai villa

Bathrooms & wet areas

Full re-waterproofing to Dubai Municipality standard, re-routed drainage, book-matched stone, concealed cisterns and hotel-grade shower systems.

  • Waterproofing
  • Marble
  • Sanitary
Modern Arabic majlis with champagne seating and brass chandelier in a Dubai villa

Majlis & reception areas

Guest majlis, formal living and dining rooms — gypsum panelling, decorative ceilings, lighting scenes and bespoke seating to your own dimensions.

  • Panelling
  • Lighting
  • Furniture
Villa exterior in Dubai with new travertine cladding after renovation

Extensions & facade

Room extensions, an additional floor, closed balconies, new cladding and windows — with structural drawings and full authority approval.

  • Structure
  • Cladding
  • Windows
Villa backyard in Dubai at night with illuminated pool and landscaping after renovation

Pools & landscaping

New pools and pool refurbishment, plant rooms, decking, pergolas, outdoor kitchens, irrigation and landscape lighting — all under the same contract.

  • Pool
  • Hardscape
  • Planting
Clean organised villa renovation site in Dubai with protected floors and new partitions

MEP, joinery and everything behind the walls

The part of a renovation that decides whether the finish still looks new in five years: full rewiring and DEWA-compliant distribution, ducted AC replacement and duct cleaning, re-piping in PPR, smart-home and CCTV backbone, water treatment, and bespoke joinery produced in our own workshop rather than bought in.

  • Electrical & DEWA
  • HVAC
  • Plumbing
  • Smart home
  • Wardrobes
  • Doors
  • Wall panelling

Why owners choose us

Six years of villa renovation in Dubai, and the habits that came with it

We started in 2019 doing exactly what we do today — renovating private villas in Dubai. Everything below exists because a project once went wrong without it.

  • 01 — Money

    The price you sign is the price you pay

    The contract is priced against a detailed BOQ and approved drawings. No open-ended "provisional sums". Any variation is quoted and approved in writing before a single worker touches it.

  • 02 — People

    Our own crews on your site

    Foremen, electricians, plumbers, tilers and carpenters are on our payroll. Specialist trades are the exception, not the model — so quality and schedule stay under our control.

  • 03 — Paperwork

    Approvals are our job, not yours

    Dubai Municipality, Trakhees, DDA, developer and community NOCs, DEWA applications, security deposits and access permits — prepared, submitted and chased by our engineering office.

  • 04 — Distance

    Built for owners living abroad

    Weekly photo and video reports, a live progress schedule, video walkthroughs on request, and procurement decisions confirmed over WhatsApp. You fly in for handover, not for site meetings.

  • 05 — Quality

    Hidden works checked before they disappear

    Waterproofing flood tests, pressure tests on pipework, insulation and load checks, and photographic records of everything that will end up behind a wall — handed to you as a project file.

  • 06 — After

    24 months of warranty, and a team that answers

    Workmanship warranty for two years plus manufacturer warranties on equipment. Callouts are handled by our own maintenance crew, usually within 48 hours.

How it works

From first call to keys — six clear stages

Typical timeline for a full turnkey renovation of a 500–700 m² villa. Partial scopes move faster; design and approvals overlap wherever the community allows it.

STEP 01

Site visit & brief

An engineer and a designer visit the villa, survey the existing structure and MEP, and go through what you want to change. You get an honest view of what the building will and will not allow.

Free · 1 day

STEP 02

Estimate & contract

A line-by-line BOQ with quantities, materials and unit rates — not a single lump sum. Once signed, that price is fixed and the payment schedule is tied to completed stages.

3–5 days

STEP 03

Design & material selection

Layouts, 3D visualisations, MEP and joinery drawings, and a physical material board — stone, tiles, paint, ironmongery — signed off before procurement starts.

3–6 weeks

STEP 04

Approvals & mobilisation

Permit package to the relevant authority, developer NOC, deposits and site access. Site protection, waste management and working-hour compliance set up before demolition.

2–4 weeks

STEP 05

Construction & fit-out

Demolition, structure, MEP first fix, waterproofing and flood tests, finishes, second fix, joinery and furniture. Weekly reports, and site access for you at any time.

4–6 months

STEP 06

Snagging & handover

Joint inspection, a written snag list closed before signature, commissioning of all systems, as-built drawings, warranties and manuals handed over as one project file.

1–2 weeks

Selected work

Villas we have renovated in Dubai

A cross-section of recent projects across Dubai communities — from a single-floor refresh to full structural rebuilds.

Renovated double-height living room in an Emirates Hills villa
Living & dining, Emirates HillsFull turnkey · 740 m²
Majlis renovated in a villa in Al Barari, Dubai
Majlis, Al BarariFit-out · 120 m²
Kitchen renovated in a villa on Palm Jumeirah
Kitchen, Palm JumeirahLayout change · 62 m²
Master bathroom renovated in a Dubai Hills villa
Master bathroom, Dubai HillsRe-waterproofed · 28 m²
Villa facade in Arabian Ranches after exterior renovation
Facade, Arabian RanchesRecladding · 310 m²
Pool and garden of a Jumeirah Islands villa after landscaping works
Pool & garden, Jumeirah IslandsPool rebuild & landscape

Budget guide

How much does villa renovation cost in Dubai?

Real 2026 ranges from our own projects, per square metre of renovated area, materials and labour included. Use them to size a budget — the binding figure comes from the BOQ after a site visit.

Villa renovation cost per square metre in Dubai, 2026
Scope of workPrice, AED / m²Typical duration
Cosmetic refreshPaint, flooring, doors, light fittings, minor repairs1,200 – 1,8004–8 weeks
Standard renovationAbove, plus bathrooms, kitchen, partial MEP and joinery1,800 – 2,6002–4 months
Full turnkey renovationStrip-out, complete MEP, all wet areas, joinery, furniture2,600 – 3,8004–6 months
Premium / bespokeImported stone, custom furniture, smart home, home cinema, spafrom 4,5006–10 months
Extension / additional floorStructural works, new envelope, full authority approval3,200 – 5,0005–9 months
Pool & landscapingNew pool, plant room, decking, planting and lightingfrom AED 180,000 per pool6–14 weeks

Ranges exclude authority fees, security deposits and VAT. Villas in older communities usually sit at the upper end because of drainage, waterproofing and electrical loads that no longer meet current standards.

Curved staircase with bronze balustrade in a renovated Dubai villa

Permits & compliance

Renovating legally in Dubai

Unpermitted work is the most expensive mistake a villa owner can make: stop-work notices, fines, refused DEWA connection and, at resale, a property that does not match its registered drawings. We handle the full package.

  • Dubai Municipality building modification permit and completion certificate
  • Trakhees approval for Nakheel communities — Palm Jumeirah, Jumeirah Islands, Jumeirah Park
  • DDA approval inside Dubai Development Authority areas
  • Developer and community NOC — Emaar, Nakheel, Meraas, Dubai Properties
  • DEWA applications for load increase, disconnection and reconnection
  • Structural drawings stamped by a licensed consultant for any load-bearing change
  • Site insurance, security deposits, working-hour and waste-disposal compliance

Coverage

Villa communities we work in

We renovate across Dubai and travel to Abu Dhabi and Sharjah for larger projects. These are the communities we work in most often, each with its own approval route and community rules we already know.

  • Emirates Hills
  • Palm Jumeirah
  • Dubai Hills Estate
  • Arabian Ranches
  • Al Barari
  • Jumeirah Islands
  • Jumeirah Park
  • Jumeirah Golf Estates
  • The Meadows
  • The Springs
  • The Lakes
  • Tilal Al Ghaf
  • Damac Hills
  • Nad Al Sheba Gardens
  • Umm Suqeim
  • Jumeirah 1–3
  • Mirdif
  • The Villa, Dubailand
  • Victory Heights
  • Al Furjan

Clients

What villa owners say

★★★★★

We were in London for almost the entire build. The weekly reports were detailed enough that we never felt out of control, and the final figure matched the contract to the dirham.

Sarah M.Full renovation, Dubai Hills Estate

★★★★★

Two previous contractors told us the extension was impossible. This team came back with structural drawings and the municipality permit in five weeks, and built it.

Ahmed R.Extension & majlis, Al Barari

★★★★★

What convinced me was the estimate — a real BOQ with quantities instead of one number on a page. Two years on, the only warranty call was a pool light.

Dmitry K.Turnkey villa, Jumeirah Islands

Questions

Villa renovation in Dubai — frequently asked

How much does it cost to renovate a villa in Dubai?

Cosmetic refurbishment starts at around AED 1,200 per m². A full turnkey renovation with new MEP, kitchen and joinery typically runs AED 2,200–3,500 per m², and premium projects with imported stone and bespoke furniture go above AED 4,500 per m². A firm figure is issued after a free site visit and takes into account the villa's condition, the scope and the specification level.

How long does a villa renovation in Dubai take?

A partial renovation of a 4-bedroom villa takes about 8 to 12 weeks. A full turnkey renovation of a 500–700 m² villa usually takes 4 to 6 months on site, plus 3 to 6 weeks for design and 2 to 4 weeks for approvals, which run in parallel where the community allows it.

Do I need approvals to renovate a villa in Dubai?

Yes. Most works require a permit from Dubai Municipality or the relevant authority — Trakhees in Nakheel communities, DDA inside Dubai Development Authority areas — together with an NOC from the developer or community management. Structural changes, extensions, pools and any modification of MEP risers always require approval. We prepare and submit the full package on your behalf.

Can the price change after the contract is signed?

No. The contract price is fixed against a signed BOQ and drawings. It changes only if you request additional scope, and each variation is priced and approved in writing before the work starts.

Can you manage the project if I live abroad?

Yes. A large share of our clients are outside the UAE. You receive a weekly photo and video report, a live progress schedule, and video walkthroughs on request. Approvals, procurement and snagging are handled by our team, and you only need to be present for the final handover.

Do you provide a warranty on the works?

Yes — 24 months of workmanship warranty on all executed works, plus the manufacturer warranty on installed equipment such as air conditioning, pool plant and appliances. Warranty callouts are handled by our own maintenance team.

Do you work with the client's own designer?

Yes. We execute third-party designs as a main contractor, and we also produce the full design package in-house when there is no designer on the project. In both cases we take single-point responsibility for the site.

Can we live in the villa during the renovation?

For a full renovation we recommend vacating the villa, mainly because of demolition dust, MEP shutdowns and community working-hour rules. Partial works — one floor, a kitchen or bathrooms — can be phased and zoned so the rest of the house stays usable.

Free estimate

Tell us about your villa

Send the community, the approximate area and what you want to change. We will come back within one working day, and the site visit and written estimate cost you nothing.